template
Parts Included
A. Frame (1)
B. Pull-Out Shelves (2)
C. Adjustable Side Baskets (4)
D. Installation Template (1)
E. #8 x 1/2" Bearing Mounting Screws (4)
F. #6 x 1/2" Upper Mounting Screws (4)
KIDNEY-SHAPED
LAZY SUSAN DRAWER SYSTEM
Inspect all parts and read all instructions prior to beginning assembly and installation.
310104-C_0114
2700 Oak Industrial Drive NE , Grand Rapids, MI 49505 USA
800.253.1561 • 616.459.3311 • www.kv.com
©2014 Knape & Vogt. All rights reserved. Made in USA. Knape & Vogt
®
reserves the right to change specifications without notice.
Tools Required
• Phillips head screwdriver
• Drill with 1/16" (1.5mm) bit for
drilling pilot holes
• Pencil
SDS-KD-28-FNW
Product Assemblies
1.
Use the installation template to locate, mark and drill the necessary top and
bottom mounting holes.
NOTE:
The installation template is designed for marking the top AND bottom
of the frame.
(A)
2.
Place the frame into the cabinet. Align the bearing mounting holes to the
pre-drilled mounting holes. Secure with fasteners.
(E)
Secure upper mounting
bracket with fasterners.
(F)
NOTE:
It may be necessary to rotate the frame in order to locate the pre-drilled
mounting holes.
3.
Test the unit for proper rotation. The unit should rotate evenly in both directions.
If the rotation is not even in both directions, then the bottom bearing is secured
in the incorrect position. To correct, remove the fasteners from the bottom bearing
only and rotate the bearing by one hole in whichever direction is necessary for
even rotation. Reinstall fasteners.
4.
Install the two pull-out shelves. To install the shelves, place shelf on slides and
push back. The shelf will be secure by the two pins that are located on the top of
the slides and the release levers will snap into the slides. Reinstall and position
the four adjustable side baskets for intended use.
D
E
F
B
C
A