
Data Vault
USER INSTRUCTIONS
Page 9
ENGLISH
VI. Installing Power Strips
(not included in 118-02)
a. Install both power strips into the
118-01. Place one in the central
compartment and route the cord
through the cable channel to the lower
compartment. Place the second in the
lower compartment.
b. Prior to installing the UPS power
system, it needs to be charged for
several hours.
c. Install UPS device into right lower compartment on shelf.
d. Plug the UPS power system into one of the GFCI slots in the
powerstrip.
e. Plug both power strips into UPS power system power backup and
surge protection slots.
VII. Installing a Computer
a. Tower Computer
Install tower computer on the lowest
shelf in the left lower compartment.
Route power cable through hole in the
middle panel and plug into power strip.
Connect USB and HDMI or VGA cable.
b. Laptop
To use laptop, connect the HDMI and USB cables.
c. Tablet
To use tablet, connect any necessary adapter to HDMI and connect
to tablet.