17
a3
A16
a3
a3
A8
A21
A8
A9
A16
4.Put 2 Support Bar A(A8) go through the Platform fabric(A16), at the same time, one of the
Support Bar A(A8) need to go through the two holes of the low section
Climbing webbing(A21), the Support Bar B(A9) need to go through the other side of
the Platform facric(A16) as below picture show.
5.Connect the Platform fabric(A16) with the Leg A(A5) and Leg B(A6) by tightening
screw a3(M8*56)
A6
A6
A5