Page 15 of 32
3. Place the dies in the die head:
a. Put the selected dies into grooves of the die head according to their sequential numbers (Fig. 4) and
lock the die notches in the curved disk.
b. Loosen the clamp lever (die head No. 1) or loosen the lock screw (die head No. 2, see Fig. 1).
c. Rotate the curved disk until the scale on the outside edge points at the pipe size.
d. Tighten the clamp lever (die head No. 1) or tighten the lock screw (die head No 2).
The die head is ready for operation.
4. Place the assembled die head plate back onto the sledge (reverse the direction arrow in Fig 2).
5. Turn the adjustable screw to the position as required (Fig. 4). The indicator next to the screw refers to the
length of threading on the pipe.
Indicator
Adjustable screw
Fig. 4
Check Cutting Oil Level
1. Check whether there is enough cutting oil in the tank. Make sure that the oil level in the tank should cover
the oil filter (8). Please see Figure 4-1
Figure 4-1
Summary of Contents for 49671
Page 21: ...Page 21 of 32 Wiring Diagram...