63
Step 7: bind up pipe
Step 8: place the indoor unit
1. Bind up the connection pipe, power cord and drain hose with the band.
indoor unit
indoor and outdoor power cord
gas
pipe
liquid pipe
drain hose
band
1. Put the bound pipes in the wall pipe and then
make them pass through the wall hole.
2. Stuff the gap between pipes and wall hole with
sealing gum.
3. Fix the wall pipe.
Do not bend the drain hose too
excessively in order to prevent
blocking.
indoor
outdoor
wall pipe
sealing gum