10
EN
ASSEMBLY
1
First slide the cover over the main element (A)
2
Then slide the dome for ceiling mounting onto the adjustment rod
that extends out of (A). The flange cover is on top, between the dome
and the main element (A).
3
Take a ladder and connect the two main elements (A) and (B). Plug
(B) onto the base plate for floor mounting beforehand. If necessary,
add an extension piece between B and the base plate.
4
Make sure that the silicone pads lie evenly on the top of the dome as
well as on the bottom of the base plate and ensure that both sit flat
on the floor and ceiling.
5
Now turn the height-adjustable part between A and the dome
counter-clockwise using the spanner provided. The thread will
unscrew from the stage (A) and put pressure on the dome and the
ceiling. The bar expands (lengthens) now.
6
Once the pressure is great enough for the rod to stop on its own
(check the hold by shaking the rod and leaning against it), lock the
threaded rod with the adjacent nut by screwing it down clockwise
until it is tight up against ( A ).
7
Slide the cover upwards until it is flush with the flange and screw it
to the flange by placing the two holes on top of each other.
8
The pole can be rotated! For this purpose, remove
the two screws at the lower end of the pole dance
bar: