83003502.Kc ECO_Install_Instruction_V03.odt
Page 18 of 39
5.10
Data cable
Attach the POF-cable end to the RX an TX connector (see photograph) at the PCB in the
control cabinet of the chiller and at the PCB in the control cabinet of the IFP.
Also use the RX TX connector on the IFP PCB.
Feed-through
- Run the POF cable from the chiller to the IFP panel.
Summary of Contents for ECO 133 L
Page 8: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 8 of 39 ...
Page 9: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 9 of 39 ...
Page 11: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 11 of 39 ...
Page 12: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 12 of 39 4 5 Dimensions in mm inch ...
Page 14: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 14 of 39 Do not drill any hole into the unit ...
Page 21: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 21 of 39 ...
Page 26: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 26 of 39 Disassembly of the flow limiter ...
Page 37: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 37 of 39 11 Overview water chiller and IFP ...