83003502.Kc ECO_Install_Instruction_V03.odt
Page 16 of 39
5.8
Phase sequence
Observe the correct phase sequence when routing the wires, otherwise the cooling block
will not start. A phase sequence relay (4A1) is installed for this purpose.
The monitoring relay has ist own power supply, measured voltage = supply voltage.
The relay monitors the phase sequence an the phase failure of one of the three phases in
a 3-phase network. No settings are necessary.
When the line voltage is switched on, the green LED lights up. IF the correct phase
sequence is applied to the terminals L1-L2-L3, the output relay picks up.
If the wrong phase sequence is applied, the red LED blinks an the output relay does not
pick up. If a phase failure occurs, the red LED lights up an the output relay drops out.
Attention: The red LED is an error diagnosis indicator an does not show the current state
of the relay.
Summary of Contents for ECO 133 L
Page 8: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 8 of 39 ...
Page 9: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 9 of 39 ...
Page 11: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 11 of 39 ...
Page 12: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 12 of 39 4 5 Dimensions in mm inch ...
Page 14: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 14 of 39 Do not drill any hole into the unit ...
Page 21: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 21 of 39 ...
Page 26: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 26 of 39 Disassembly of the flow limiter ...
Page 37: ...83003502 Kc ECO_Install_Instruction_V03 odt Page 37 of 39 11 Overview water chiller and IFP ...