
2-3-6 Installing flue (Fitting The Flue (Cont) )
Fitting The Flue (Cont)
8. Adjust the tow telescopic sections to dimension 'Y'
Ensure that the rivets and holes in the Connection Assembly
are aligned horizontally
9. Using a 2mm bit, drill through the holes at the end of the Connection
Assembly into the Terminal Assembly and secure together
using he screws supplied
Seal the joint with the tape provided
10. Remove the flue elbow and insert the flue through the hole in
the wall. Refit the elbow to the boiler adaptor, ensuring that it is
pushed fully in
11. Draw the flue back through the wall and engage it in the elbow
It may be necessary to use soap solution or similar to ease assembly
of the elbow adaptor and flue
12. Ensure that the terminal is positioned with the slots to the bottom
IMPORTANT :
It is essential that the flue terminal is fitted as
shown to ensure correct boiler operation and prevent water
entering the flue
13. Make good between the wall and air duct outside the building
14. Fit the flue trim inquired, and if necessary fit a terminal guard
(see Section 8.8 ~ 8.9)
CONCENTRIC VERTICAL FLUE
15. Once the length of the vertical concentric extension has been
determined mark and carefully cut off the excess
material. The cut end MUST be square and free of burrs to ensure
correct insertion into the boiler adaptor.
16. Measure 25mm from the end of the flue extension and apply a
length of tape around the boiler duct
17. Engage the extension into the adaptor up to this position
Once the installation of the flue is complete and all support brackets
securely in place remove the tape
13페이지