36
7.4
Pendant
7.4.1
The following procedure covers the installation of a pendant control station.
1)
Attach the strain relief chain and the three hoses to the pendant station.
2)
Attach the strain relief chain to the hoist valve body with the socket bolt as shown in Figure 7-4.
3)
Attach the three hoists to the fittings on the hoist's valve body. Refer to Figure 7-4 and make sure
the up, down and supply hoses are attached to the correct locations.
4)
When attaching tubes take care not to bend or kink tubing. This will result in
the air flow being restricted and poor response to the pendant controls.
5)
Attach the hoist to supply air. Check for leaks and properoperation.
6)
The pendant hoses hoist must be connected so that its direction of operation
corresponds to the up-and-down lever on the pendant control; i.e. pushing the up button must
cause the hook to raise. If the hoist does not operate correctly, shut off the air supply to the hoist
and correct the pendant connections.
Figure 7-4
Pendant Hose and Strain Relief Connections
Summary of Contents for Harrington TCR
Page 11: ...11 Figure 2 2 Hoist Part Identification Diagrams 25 Ton TCR25000P2 and TCR25000C2...
Page 42: ...42 NOTES...
Page 43: ...43 NOTES...
Page 46: ...2 of 10 TCR10000...
Page 50: ...6 of 10 TCR25000...