![Kipp & Zonen Brewer Mk III Operator'S Manual Download Page 65](http://html1.mh-extra.com/html/kipp-and-zonen/brewer-mk-iii/brewer-mk-iii_operators-manual_1971770065.webp)
MKIII OPERATOR'S MANUAL
62
5.
Return to the Computer and follow the instructions for saving the new siting information.
Before saving new values, recheck that the Date and Time are correct.
For accurate tracking to take place the Tracker must be quite level.
Levelling can be checked by alternating the times of day when siting is done - check the
siting in the early morning on one day, and in the late afternoon on another.
If it is found that the North Correction numbers alternate between higher and lower numbers
consistently from morning to afternoon then this is an indication that the levelling is not
accurate.
If there are very inconsistent North Correction values from one siting to another, this could
be an indication of the Tracker drive mechanism slipping.
If there are inconsistent Horizon Correction values, this could be an indication of Zenith
Prism slippage.
If there is a constant drift in both Horizon and North corrections, then this could be an
indication that the site co-ordinates could be incorrect.
Summary of Contents for Brewer Mk III
Page 1: ...Operators manual Spectrophotometer Brewer MkIII...
Page 3: ...ii...
Page 5: ...2...
Page 7: ...4...
Page 25: ...MKIII OPERATOR S MANUAL 22...
Page 29: ...MKIII OPERATOR S MANUAL 26 Figure 3 4 Brewer Spectrophotometer Tripod...
Page 63: ...MKIII OPERATOR S MANUAL 60...
Page 83: ...MKIII OPERATOR S MANUAL 80...
Page 91: ...MKIII OPERATOR S MANUAL 88...
Page 93: ...MKIII OPERATOR S MANUAL 90...
Page 97: ...MKIII OPERATOR S MANUAL 94...
Page 129: ...MKIII OPERATOR S MANUAL 126...
Page 135: ...MKIII OPERATOR S MANUAL 132...