5
-
5
운운 운운
mX70/mX80/mX90/mX100
5
-
5
-
5
운운 운운
mX70/mX80/mX90/mX100
5
-
5
3-point HitcH impLement And LoAder operAtion
6
6
-
5
M56O601A
(1) top Link
(2) Lift rod (L)
(3) Lift rod (r)
(4) check Link
(5) Lower Link
(6) draw Bar
OPERATION TIP fOR 3-POINT HITCH ELEMENTs
1. install the top link to the desired
hole, install the set pin and lynch
pin securely.
2. tighten the lock nut on the top link
securely after adjusting top link
length.
M56O602A
(1) top Link
ADjusTMENT Of TOP LINk
m56(tB110)(Ck2810)-호주판-om-06.ind5 5
2012-10-16 오후 2:36:51
Summary of Contents for CK2810
Page 34: ...MEMO MEMO M56 TB110 CK2810 OM 01 ind24 24 2012 10 15 4 09 21...
Page 40: ...MEMO MEMO M56 TB110 CK2810 OM 02 ind6 6 2012 10 15 4 11 23...
Page 86: ...MEMO MEMO M56 TB110 CK2810 OM 04 ind38 38 2012 10 15 4 34 58...
Page 126: ...MEMO MEMO m56 tB110 Ck2810 om 06 ind16 16 2012 10 16 2 37 00...
Page 173: ...10 10 INDEX INDEX 10 2 M56 TB110 CK2810 OM 10 ind1 1 2012 10 16 3 02 26...
Page 180: ...M56 TB110 CK2810 OM 10 ind8 8 2012 10 16 3 02 27...