Control Panel Installation 

4.1 

General Installation 

4.1.1 

The control panel need not be adjacent to the plant. It can be wall mounted or fixed to the mounting 
frame (available separately). It should be positioned so it cannot be reached by someone standing in 
or on the BioDisc unit. 

4.1.2 

The control panel should be fitted by a qualified electrician working to the latest IEE Regulations. 

4.2 

Mounting Frame Installation (where applicable) 

4.2.1 

Set the frame legs in a concrete base, minimum 250mm thick and prop the frame to prevent 
movement until the concrete has set. 

4.2.2 

Allow 350mm minimum clearance from finished ground level to the bottom of the panel. 

4.3 

Installation of Control Panel  

Figure 1 : Control Panel 

4.3.1 

Remove the four screws on the front of the panel and remove the main cover. 

4.3.2 

Remove the four screws holding the safety cover and remove the safety cover. 

4.3.3 

Remove the two screws holding the isolating cover and remove the isolating cover. 

4.3.4 

Using a suitable M20 gland, feed the mains power supply through Gland Hole 1 (Figure 1). Wire the 
mains supply to the terminal blocks following the guide on the connections. 

4.3.5 

Replace the isolation cover and screws. 

4.3.6 

Using a suitable M20 gland, feed the motor power supply cable through Gland Hole 4 (Figure 1) and 

terminate to connections 5 & 6 (TB3) following the guide on Table 2. 

 

    2        3           4 

 5 

    6        7            8 

  9 

Main Cover 

Isolating Cover 

Safety Cover 

Summary of Contents for BioDisc BA

Page 1: ...ical connection or if there is no power available to operate the unit then the motor with gearbox must be removed and stored in a dry environment The motor keeps dry by generating its own heat when op...

Page 2: ...d recommended Please contact Kingspan for details of your local service provider Should you wish to inspect the operation of the equipment please observe all necessary precautions including those list...

Page 3: ...shire HP22 5EW United Kingdom 07 EN 12566 3 BA BF BioDisc Hydraulic daily load 1 2m day 10m day Material GRP Glass Reinforced Plastic Watertightness water test Pass Structural Calculation Pass Treatme...

Page 4: ...4 2 Mounting Frame Installation where applicable 10 4 3 Installation of Control Panel 10 4 4 Installation of Integral Discharge Pump where applicable 11 4 5 Installation of Sludge Return Pump where ap...

Page 5: ...owing points should be considered before installation of the equipment 1 3 2 The discharge must have the consent of the relevant Environmental Regulator 1 3 3 The installation should have Planning and...

Page 6: ...table selection of the cable is the responsibility of the installing electrician Full Load Current Amps BA BAx BB NB Motor 240 volt single phase 0 52 0 52 0 52 0 52 415 volt three phase 0 22 0 22 0 22...

Page 7: ...of the unit contains this copy of the Installation Guidelines and a cover key 2 2 2 Excavate a hole of sufficient length and width to accommodate the unit and a minimum of 150mm concrete surround and...

Page 8: ...red Cable supply to control panel Customer Supply Inlet Pipe Outlet Effluent to Soakaway Ditch Stream etc via Sample Chamber if fitted Control Panel Refer to Section 6 for position G L 450mm Inlet Inv...

Page 9: ...l as described in Section 3 2 4 6 Continue to back fill with concrete wet site or free flowing granular material dry site up to ground level The finished surface should be 95 mm minimum lower than the...

Page 10: ...et 4 2 2 Allow 350mm minimum clearance from finished ground level to the bottom of the panel 4 3 Installation of Control Panel Figure 1 Control Panel 4 3 1 Remove the four screws on the front of the p...

Page 11: ...applicable 4 5 1 Using a suitable M20 gland feed the integral discharge pump power cable through Gland Hole 3 Figure 1 and terminate to connection 3 4 TB2 following the guide on Table 2 4 5 2 Set the...

Page 12: ...crewdriver push switch 10 to the ON position 4 8 Installation of High Level Alarm where applicable 4 8 1 Remove the link in the terminal blocks between connections 11 12 TB6 before inserting cables Us...

Page 13: ...owing the procedure in the Owners Handbook and leave the unit running even if there is no sewage being fed into the plant 7 1 4 If the unit has been installed with no operational power supply then rem...

Reviews: