14
3. Fix the lower handle bar (6) with the Arc-head blot M8X35 (18) to the handle supports (17) Fig. 3.
18
5
5
6
Fig. 3
4. Align the mounting holes of the upper handle bar (1) with the ones on the lower handle bar (6). Ensure the rope guide (21) is
properly aligned. Secure the connection with the knobs (5) and bolts (4) (Fig.4).
1
21
5
5
6
21
4
Fig. 4