Kinetic Solar K-Rack™
Installation guide
Page 3 of 37
27 May 2019
3.
List of Figures
FIGURE 1 - TORQUE SPECIFICATIONS
FIGURE 2: INSERTING K-NUT INTO SIDE CHANNEL
FIGURE 3 - INSERTING K-NUT INTO TOP CHANNEL (END-CLAMP SHOWN)
FIGURE 4 - HAT RAIL NUT INSERTION PROCEDURE
FIGURE 5 CABLE MANAGEMENT OPTIONS (LEFT) CABLE RACEWAY, (MIDDLE) LOCK-ON CABLE TIE, (RIGHT)
FIGURE 7 INTEGRATED CABLE MANAGEMENT
FIGURE 8 CABLE RACEWAY INSTALLATION PROCEDURE
FIGURE 9 GROUNDING PATH DETAIL
FIGURE 10 COMPONENT COMPATIBILITY CHART
FIGURE 11 GROUNDING PATH OF CONVENTIONAL AND SHARED RAIL SYSTEMS
FIGURE 12 FIXED ANGLE GROUND MOUNT GROUNDING PATH (BOTTOM GROUND LUG ATTACHMENT SHOWN)
FIGURE 13 ADJUSTABLE GROUND MOUNT GROUNDING PATH
FIGURE 14 JOINER COMPATIBILITY
FIGURE 15 BONDING CONDUCTOR REQUIREMENTS
FIGURE 16 GROUND LUG MOUNTING OPTIONS
FIGURE 17 BONDING AND GROUNDING DEVICES
FIGURE 18 MODULE REMOVAL PROCEDURE
FIGURE 19 UL 2703 DESIGN LOADS
FIGURE 20 LTR-AE-001-2012 DESIGN LOADS
FIGURE 21 CONVENTIONAL VS SHARED RAIL
FIGURE 22 FLASHING POSITIONING
FIGURE 23 MEASURE AND PRE-DRILL
FIGURE 29 HANGER BOLT RIDGE INSTALLATION
FIGURE 30 HANGER BOLT TROUGH INSTALLATION
FIGURE 32 END AND MID CLAMP POSITIONS IN CONVENTIONAL AND SHARED RAIL LAYOUTS
FIGURE 33 INTEGRATED CABLE MANAGEMENT
FIGURE 34 INTEGRATED CABLE MANAGEMENT