Kinetic Solar K-Rack™
Installation guide
Page 27 of 37
27 May 2019
9.2.1.2.
Universal L-Mount
Install on individual shingle surface. Surface must be flat and even (within 1/16“) to
ensure watertight seal – do not install over cut out or butt edge of shingle.
1.
Measure and mark the appropriate mount locations. Use a measuring tape to
ensure chalk lines are straight and square.
2.
Prepare roof for the installation of lag bolts by drilling two 7/32” pilot holes
through the roof and into the rafter for each mount that will be affixed.
3.
Peel wax paper off backing of mount prior to its final placement.
4.
Screw each mount into position using two lag bolts.
9.2.2.
Metal Roof
9.2.2.1.
Trapezoidal/Corrugated
9.2.2.1.1.
Hippo Mount
i.
Drill two 7/32” pilot holes through the seam and into the rafter for each Hippo
Mount.
ii.
At each location, position the Hippo Mount parallel to the seam of the roof
iii.
Insert a bead of Geocel 4500 or BES 925 into each of the pilot holes
iv.
Install Lag Bolts (with EPDM washer) through the Hippo Mount and into the pilot
holes