![Kinder Concept KCDW MN2 Series Installation And Maintenance Instructions Manual Download Page 14](http://html1.mh-extra.com/html/kinder/concept-kcdw-mn2-series/concept-kcdw-mn2-series_installation-and-maintenance-instructions-manual_1967933014.webp)
Continue for all models
Whilst the fire box is still in position, decide which side the gas supply is to enter
the fire from. The inlet elbow position is at the L/H side of the firebox for MC
variants and the R/H side for RC variants. The gas connection to the appliance
should be made to the isolating / inlet elbow using 8mm rigid tubing. There must
be no soldered joints within the firebox. See fig. 10 & 11 below for
suggested concealed pipe layouts.
Fig. 10 - Position of gas supply for RC variants
Fig. 11 - Position of gas supply for MC variants
Note : Before breaking into the gas supply a pressure drop test should be
carried out to establish that the existing pipework is sound.
Carefully withdraw the fire box from the opening to enable the gas supply and fire
fixing to be completed.
14
Firebox
Fireplace
Builders
Opening
Gas Supply
Firebox
Approx.
40mm
Fireplace
Gas Supply
Approx.
40mm
Builders
Opening