71
flush to bottom & 1-1/4" to end of board
8X #8 x 3" WS
2 x
Tunnel Top 31.8 x 76.2 x 366.7mm
Step 41: Tunnel Frame Assembly
Part 2
Wood Parts
Hardware
9086
B:
Place 1 (9086) Tunnel Top at each end of the joists so that they line up with the inside set of pre-drilled holes
on the (9089) Short Tunnel Side Joists. Attach using 8 (S4) #8 x 3” Wood Screws. (Fig. 41.3 and 41.4)
8 x
#8 x 3” Wood Screw
Fig. 41.3
Fig. 41.4
S4
x 4 per side
9086
9086
S4
9089
9089
Summary of Contents for F24866
Page 94: ...94 NOTES...