70
4X 5/16 t-nut
2 x
Short Tunnel Side Joist 31.8 x 76.2 x 914.4mm
9089
Step 41: Tunnel Frame Assembly
Part 1
Wood Parts
Hardware
4 x 5/16” T-nut
Fig. 41.1
Fig. 41.2
A:
Place 2 (9089) Short Tunnel Side Joists side by side making sure that the pre-drilled holes for the t-nuts are
at the bottom. Install 1 t-nut on the inside of all 4 ends. (fig. 41.1 and 41.2)
Notice hole orientations
5/16” T-nut
3’ Tunnel & Chin Bar Assembly
9089
9089
Summary of Contents for F24866
Page 94: ...94 NOTES...