36
Step 13: Attach Hand Grips
A:
On the Rock Wall measure 2”(50.8mm) up from the top of the Vertical Rock Boards and center 1 Hand
Grip on the post. Pre-drill with a 1/8”(3.2mm) drill bit and attach using 2 (LS1) ¼ x 1-1/2” Lag Screw (with flat
washers). (fig. 13.1 and 13.2)
B:
On the Back Wall of the assembly and to the center, repeat step A to attach second hand grip. (fig. 13.2 and
13.3)
Fig. 13.2
Fig. 15.3
4 x
1/4 x 1-1/2” Lag Screw
(with flat washer)
Hardware
LS1
Other Parts
2 x Hand Grip
9272
2”
(50.8mm)
LS1
Flat
Washer
Flat
Washer
Hand
Grip
LS1
Hand
Grip
Fig. 13.1
Hand
Grip
Rock Wall
Summary of Contents for BLOOMFIELD F29180
Page 8: ...8...
Page 9: ...9 9527 34 9 x 63 5 x 1310 5mm Ladder Rail Box 1 3589527...
Page 61: ...61 NOTES...
Page 62: ...62 NOTES...
Page 63: ...63 NOTES...