background image

P/N 3101069-EN • REV 005 • ISS 19OCT20 

 

3 / 6 

Table 4: Detector address 
Address 

Panel 

01 to 64  

64 point control panel 

01 to 127  

127 point control panel 

Figure 3: Sampling tube support 

 

(1)  HVAC duct 

(2)  Exhaust tube 

(3)  Detector 

(4)  Sampling tube 

 

(5)  Airflow 

(6)  Plug 

(7)  Sealant 

Figure 4: Duct detector installation 

 

(1)  Airflow 

(2)  HVAC duct 

(3)  Detector 

 

(4)  #10 sheet metal screws (2X) 

(5)  Sampling tube 

Figure 5: Address switches 

 

(1)  Insert screwdriver here 

Wiring 

Wire in accordance with NFPA 72 and CAN/ULC-S524. Be sure to 

observe the polarity of the terminals on the terminal block as shown 

in Figure 6.  

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

 36 in. (0.92 m)

(1)

(2)

(3)

(5)

(4)

0

1

2

3

4

5 6

12

11

10

9

8

7

0 9

1

2

3 4 5 6

7

8

(1)

firealarmresources.com

Reviews: