6
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Toggle
®
Tables - Triple Motor C-Leg Height-Adjustable Square Shoe Base, Model SS
Assembly Instructions
This product is for use on a nominal 120-volt circuit and has a grounding plug
that looks like the plug illustrated in Detail G. Make sure that the product is
connected to an outlet having the same configuration as the plug. No adapter
should be used with this product.
GROUNDING INSTRUCTIONS
Undermounted R8 Power
Module Installation (optional)
Note:
The Undermounted R8 power
module can be mounted to the
underside of the Toggle tabletop
between the cross-tube assemblies
on the longer side of the table,
and can face the user or non-user
side of the table. If desired, the
undermounted power module’s four
mounting holes can be used as a
template underneath the tabletop
to mark, then drill holes for an
alternative mounting location.
1. Position the Undermounted R8
power module to the underside of the
worksurface at the desired pre-drilled
mounting location. Assure that the
power cord can be routed easily to a
power source (Figure 7).
2. Align the pre-drilled mounting holes
of the R8 power module with the
drilled mounting holes underneath
the tabletop. Secure the R8 power
module to the worksurface using four
#8 x
3
/
4
” wood screws. Take care to
not over tighten (Figure 7).
3. Route the power cord to an approved
power source if optional mounting
clamps are not desired.
CAUTION:
Risk of electrical shock.
Do not plug into another relocatable
power tap or an extension cord.
Cable Clamp Installation
(optional)
1. Route the power cord for the
Undermounted R8 power module
along the underside of the tabletop
and mark the pilot hole locations
where the cable clamps will be
installed. Four cable clamps are
provided with each R8 power
module, but depending on your
configuration not all clamps may be
required (Figure 8).
2. Position the power cord out of the
way. At each marked cable clamp
location, drill a pilot hole to a depth
of
3
/
4
”, making sure to not drill too
deep, piercing the tabletop
(Figure 8).
3. Nest the power cord inside the cable
clamps. Position the cable clamps
over the pilot holes and secure to the
tabletop using #8 x
3
/
4
” wood screws
(Figure 8 & Detail G).
4. If optional wire trough was specified
for installation, go now to page 7. If
no wire trough is specified, carefully
turn table to the upright position with
the help of another person. Adjust
glides on feet to level the table. Plug
the power cord into a grounded
outlet power source (Detail G).
Note:
Power cord must have enough
slack so the table can cycle through
its entire range of motion.
#8 x / ”
wood screws
3
4
Undermounted
R8 power module
pre-drilled
mounting
holes
square shoe
tabletop
Figure 7
Figure 8
cable clamp
(optional)
power
cord
Undermounted
R8 power module
USER
SIDE
Detail G
cable clamp
(optional)
5.
The table must be “zero set”
prior to being placed into
service. Refer to table “zero
setting” instructions in the
trouble shooting guide on
page 9.
6. If the table is not operating properly,
see the trouble shooting guide in this
instruction.