INSTALLATION
System Installer must adhere to Article 820-40 of the NEC that provides guidelines
for proper grounding and specifies that the cable ground shall be connected to the
grounding system of the building, as close to the point of cable entry as possible
.
UNPACKING
and
INSPECTION
Each unit is shipped factory tested. Ensure all items are removed from the container prior to discarding any
packing material.
Thoroughly inspect the unit for shipping damage with particular attention to connectors and controls. If
there is any sign of damage to the unit or damaged or loose connectors contact your distributor
immediately. Do not put the equipment into service if there is any indication of defect or damage.
PRODUCT
PICTURES
and
DIAGRAMS
HDM
‐
1000
HDM
‐
2000
HDM
‐
4000
HDM-1000/2000/4000 Manual V1.0
6