0208 681 0097
10
Operating & Maintenance
Dry Well Submersible Pump Set
Electrical Connections
➢
The incoming supply must be sized to carry the motor full load current of all pumps
(as all can be in operation at any one time).
➢
All electrical connections are to be made against the relevant product wiring diagrams.
➢
All electrical connections should be sized, installed and protected in accordance with the
requirements of the latest safety standards and any other current local rules and regulations.
➢
It is the responsibility of the installer to ensure that the cable and fuse/MCB protection is
suitably rated to accommodate the pump set, and that the integrity of the main incoming
supply is tested and certified prior to applying power to the set.
➢
It’s essential that this equipment is earth bonded to the building earth system.
Pre-start up
➢
The pump(s)
must not
be allowed to run dry under any circumstances as overheating will
rapidly damage the internal components of the pump.
➢
Pipework attached to the pump set must be suitably supported so that there are no forces
acting upon the discharge pipes of the set.
Please also refer to the specific pump manufactures manual.
These instructions are in general and not specific to a particular
pump set
– refer to your quote/order details to confirm specific
model.