Pg. 3
Figure K
Install Bungee System (optional step)
The shade includes two (2) Bungee Tie Downs to secure the bottom of both sides
of your shade. To install the Bungee System, start by feeding the Bungee through
the Bottom Tube Plugs located at each end of your Bottom Tube (Fig. K). Then
insert the Bungee into the Hook and drill the Hook into a wall/post using one (1)
Bracket Screw from your hardware box. To prevent fabric stretching/damage,
hooks should be installed directly underneath the Bottom Tube Plugs so there is
equal tension on each bungee.
Important: Your shade should be rolled up during windy conditions. The Bungee
System is only effective in light wind. When using your shade, we recommend
leaving at least one (1) roll of fabric wrapped around the top tube.
Additional Optional Steps
By default, your shade is prepared for a wall installation (Fig M) and comes with
the Crank Bracket on the right side of the shade. If you require a ceiling installation
you will need to make a few small changes to your brackets.
To change your brackets, begin by removing your bracket covers (Fig N).
Remove the 2 screws from the Crank Bracket (Fig O) and the 3 screws from the
Plug Bracket (Fig P).
After removing the screws from both brackets rotate the hardware to match desired
installation configuration (Fig Q).
Wall Installation
Fig. M
Fig. N
Fig. O
Fig. P
Ceiling Installation
Fig. Q
CHANGING INSTALLATION TYPE (optional step)
To watch a video of the steps listed below, please visit: www.shadeinfo.com/video-help-pnv