Page 1: ...eysight Add 4 Port Capability Upgrade Kit Installation Note To Upgrade PNA N5221B or N5222B Option 219 to Option 419 Upgrade Kit Order Number N5221BU 619 and N5222BU 619 Keysight Kit Number N5222 6011...

Page 2: ...S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula The license set...

Page 3: ...analyzer to a N5221B or N5222B Option 419 4 port analyzer by adding an additional source an additional source synthesizer an additional mixer brick two additional receiver couplers two additional tes...

Page 4: ...Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight field engineer If You Have Problems With the Upgrade Kit Contents Keysight stands behin...

Page 5: ...tware Manager http www keysight com find softwaremanager To complete the request you will need to gather the following information From the certificate Order number The PNA contains extremely sensitiv...

Page 6: ...umber use the following steps 1 Go to www keysight com 2 In the Search box enter the model number of the analyzer Ex N5221B and click Search 3 Click Technical Support Manuals 4 Click Service Manual 5...

Page 7: ...pen end torque wrench set to 6 in lbs 0 68 N m 1 5 8 in 16 mm nutsetter or open end torque wrench set to 21 in lbs 2 38 N m 1 1 in 25 4 mm torque wrench set to 72 in lbs 8 15 N m 1 Use a 5 16 in torqu...

Page 8: ...pler A35 Test port 3 source attenuator 2 33321 60077 A36 Test port 4 source attenuator A39 Test port 3 bias tee includes wire harness 2 5067 4865 A40 Test port 4 bias tee includes wire harness A43 Tes...

Page 9: ...34 Cable tie 6 1400 0249 Bracket for receiver coupler 2 N5242 00006 Bracket for attenuator assemblies 2 N5242 00007 Bulkhead connector for test set front plate hardware supplied with connector 12 1250...

Page 10: ...W60 RF cable A20 IF multiplexer board P203 to A12 SPAM board J2 1 N5242 60013 W62 RF cable A20 IF multiplexer board P603 to A12 SPAM board J5 1 N5242 60015 W67 RF cable A10 frequency reference board...

Page 11: ...rd J206 to A43 port 3 receiver attenuator 1 8121 0982 Ribbon cable A19 test set motherboard J207 to A44 port 4 receiver attenuator 1 8121 0982 Ribbon cable A19 test set motherboard J202 to A35 port 3...

Page 12: ...27 Receiver Coupler Assemblies Step 12 Assemble the A35 and A36 Source Attenuators and the A43 and A44 Receiver Attenuators Step 13 Install the A39 and A40 Bias Tees A35 and A36 Source Attenuators and...

Page 13: ...ge 5 Verify that the model number serial number and option number information on the license key match those of the instrument on which this upgrade will be installed If the model number serial number...

Page 14: ...0 in the PDF Service Guide1 These cables may be discarded they will not be reinstalled W42 N5222 20073 A21 HMA26 5 to A23 mixer brick W48 N5222 20003 A33 reference mixer switch to A23 mixer brick R1 W...

Page 15: ...qty 6 Front panel jumper NOTE Remove and save the cable guards for the front panel jumpers Step 7 Remove the A23 Mixer Brick Assembly Remove the A23 mixer brick assembly from the PNA For instructions...

Page 16: ...16 Installation Note N5222 90119 Installation Procedure for the Upgrade Figure 2 A24 Mixer Brick Block Assembly cont...

Page 17: ...tion Procedure for the Upgrade Step 9 Assemble the A26 and A27 Receiver Coupler Assemblies Follow the instructions shown in Figure 3 New parts are listed in Table 1 on page 8 of this document Figure 3...

Page 18: ...Follow instruction 1 shown in Figure 4 New parts are listed in Table 1 on page 8 of this document Figure 4 Mixer Brick Block and Receiver Coupler Assemblies Installation Step 11 Install the A26 and A2...

Page 19: ...cedure for the Upgrade Step 12 Assemble the A35 and A36 Source Attenuators and the A43 and A44 Receiver Attenuators Follow the five instructions shown in Figure 5 Figure 5 A35 A36 Source Attenuators A...

Page 20: ...tep 13 Install the A39 and A40 Bias Tees A35 and A36 Source Attenuators and the A43 and A44 Receiver Attenuators Follow the instructions shown in Figure 6 Figure 6 A39 A40 Bias Tees A35 A36 Source Att...

Page 21: ...rom the PNA For instructions click the Chapter 7 bookmark Removing and Replacing the A29 A32 Test Port Couplers in the PDF Service Guide1 2 Using pliers remove the adhesive bumper on the A29 test port...

Page 22: ...from the 2 port test set front plate of the PNA Keep the screws and LED boards for reuse later 2 Remove the 12 bulkhead connectors nuts and washers from the 2 port front plate to reuse later 3 Remove...

Page 23: ...new bulkhead connectors included in the kit for the remainder of this step 2 From the back side of the test set front plate insert a bulkhead connector into a hole in the plate 3 Install 1x washer an...

Page 24: ...n Note N5222 90119 Installation Procedure for the Upgrade Step 17 Install the 4 Port Coupler Plate Assembly to the Deck Follow the four instructions shown in Figure 10 Figure 10 Coupler Plate Assembly...

Page 25: ...nstallation Note N5222 90119 25 Installation Procedure for the Upgrade Step 18 Assemble the A8 26 5 GHz Source 2 Assembly Follow the three instructions shown in Figure 11 Figure 11 A8 Source 2 Assembl...

Page 26: ...allation Note N5222 90119 Installation Procedure for the Upgrade Step 19 Install the A8 26 5 GHz Source 2 Assembly Follow the three instructions shown in Figure 12 Figure 12 A8 Source 2 Assembly Insta...

Page 27: ...ly connected to J5 of the A13 source 2 synthesizer board Step 21 Install the Test Set Cables Flexible Cables Required for Upgrading to an Option 401 PNA Install the following gray flexible cables in t...

Page 28: ...ias tee to A32 port 2 coupler W22 N5222 20018 A31 port 4 coupler to front panel Port 4 CPLR ARM W80 N5222 20020 A36 port 4 source attenuator to front panel Port 4 SOURCE OUT W50 N5222 20027 REF 4 RCVR...

Page 29: ...e mixer switch to front panel REF 1 SOURCE OUT Refer to the note shown in Figure 13 for information on installing W35 part number N5222 20033 W17 N5222 20023 A26 port 3 receiver coupler to front panel...

Page 30: ...cable clamps part number 1400 1334 to secure W49 part number N5222 20024 Figure 14 Location of Cable Clamps to Secure W49 W48 N5222 20101 A33 reference mixer switch to A23 mixer brick R1 As shown in...

Page 31: ...reference mixer switch If the screws that attach the reference mixer switch to the test set deck were loosened torque these screws now to 9 in lbs W10 reuse N5222 20043 W9 to A28 port 2 receiver coupl...

Page 32: ...4 receiver attenuator N5242 60008 A19 test set motherboard J202 to A35 port 3 source attenuator N5242 60008 A19 test set motherboard J203 to A36 port 4 source attenuator no part number A19 test set m...

Page 33: ...ont Panel Assembly For instructions on reinstalling the front panel assembly click the Chapter 7 bookmark Removing and Replacing the Front Panel Assembly in the PDF Service Guide1 Be sure to install t...

Page 34: ...e W30 front panel jumper cables N5222 20091 use 6 new jumpers and reuse 6 old jumpers To see an image of the front panel jumper cables click the Chapter 7 bookmark Removing and Replacing the Front Pan...

Page 35: ...cedure 1 To start the Keysight License Manager press Start Keysight License Manager Keysight License Manager A Keysight License Manager dialog box will appear 2 Right click the on the desired option a...

Page 36: ...m Keysight which contain license file attachments These emails are a result of Step 1 Obtain a Keyword and Verify the Information on page 13 2 Copy the license file s from the email s to the root dire...

Page 37: ...Network Analyzer program is again running 1 On the analyzer s Help menu press About Network Analyzer 2 Verify that 419 are listed but 219 is not listed after Options in the display Click OK Attempting...

Page 38: ...bookmark Tests and Adjustments in the PDF Service Guide1 After the specified adjustments have been performed the analyzer should operate and phase lock over its entire frequency range Operator s Check...

Page 39: ...e PNA for the User 1 If necessary reinstall front jumper cables 2 Install the cable guards pushing them over the front jumper cables until the cushioning material touches the front panel of the PNA 3...

Page 40: ...40 Installation Note N5222 90119 Installation Procedure for the Upgrade...

Page 41: ...Installation Note Xxxxx xxxxx 3...

Page 42: ...This information is subject to change without notice Keysight Technologies 2000 2017 Edition 2 May 2017 www keysight com...