44
N2780/1/2/3B User’s Guide
Performance Verification
Amplitude Accuracy Test
1
Connect the equipment as shown in
. Warm up all instruments for 30
minutes before starting the test procedure. While the test system is warming
up, clean the magnetic contacts on the probe jaw.
Figure 28
Test Setup Shown with N2782B
2
Press the
DEMAG
button on the probe terminator.
3
Configure the DMM to measure AC Volts.