M9514A AXIe Chassis 14-Slot
Site Preparation and Installation Guide
11
1
Introduction
Thank you for purchasing Agilent's M9514A AXIe 14-slot Chassis. To get you
started and to assure a successful and timely installation, we’ve developed this
Site Preparation Guide. Please read it carefully and follow all guidelines.
Correct site preparation is the key first step in ensuring that your chassis and
software system operate reliably over an extended lifetime. This document is an
information guide that outlines the utility requirements, space, and supplies for
your chassis for your site.
After preparing the site and installing the M9514A chassis, review the:
-
M9514A AXIe Chassis Startup Guide.
It provides chassis verification, installing
AXIe instrument modules, connecting to a remote host computer or using an
embedded controller.
-
M9521A AXIe System Module Startup Guide.
Provides installation and startup
information about the M9521A ASM
-
M9514A and M9521A User Guide.
It provides detailed information about the
chassis, troubleshooting and service information, etc.
Both of these guides are available on the on the
Software and Product
Information CD
that ships with your chassis.
Customer Responsibilities
Make certain your site meets the following requirements prior to the installation.
Details on these requirements are provided in this document.
If you have questions or problems in providing anything described in the
Customer Responsibilities checklist above, please notify your local Agilent
support/service organization for assistance prior to delivery.
Operating environment (cooling, noise, etc.) is suitable. (
and
Receiving and transportation requirements are met (including uncrating). (
The necessary bench top or rack space is available. (
)
AC power requirements, power cords, etc. are met. (
).
Customer provides power cord (from mains disconnect to chassis) and IEC 60309
(3P+N+E, 6H Red) receptacle.
Additional supplies (host computer, PCIe adapter, cables, LAN, etc.) are available.