39
Keysight E5063A Network Analyzer
Troubleshooting Guide
2
Post Repair Procedures
lists the required procedures that must be performed after the
replacement of an assembly. These are the recommended minimum
procedures to ensure that the replacement is successfully completed.
Table 2-1
Post Repair Procedures
Replaced
Assembly or Part
Required Adjustment Correction
Constants (CC)
Verification
A1 or A3 Analog
Board
When you replace the defective
analog module, it is not necessary to
performing the adjustment. The
boards are adjusted at factory.
Correction Constant data is stored
in A1 or A3 Analog board itself and
uploaded to SSD automatically.
Perform all of the
Performance Test.
A51 DSP Board
Perform the following required
adjustments using “A51 DSP Board”
in Spot Adjustment of the program.
Inspect the Booting
Process
SSD (Solid State
Drive)
Perform the following required
adjustments using “SSD (Solid State
Drive” in Spot Adjustment in the
program. Copy from license file (.lic)
under E:/license
Inspect the Booting
Process