Getting Started Guide 17
Quick Start
Location and Mounting
Location and Mounting
It is recommended to suspend the transceiver above the Device Under Test
(DUT), with the mmWave port pointed downwards at the DUT, so that heat
given off by the transceiver will rise away from the DUT. Leave a minimum
clearance of 2.5 inches (7 cm) around the transceiver. Also, ensure there is
enough room to attach all necessary cables between the transceiver and other
devices.