25
Installation and Servicing
FLUE OUTLET
SECTION 2 - INSTALLATION
2.11 FITTING THE SLEEVING
Flue Sleeve
Flue Pipe
Flue
Terminal
Flexible
Wall
Seal
Wall
Plate
Flue Sleeve Flange
1. Cut hole in wall.
2. Measure wall Thickness
3. Cut sleeve length to match wall thickness & remove burrs.
4. Grout sleeve into wall with flange on external face.
5. Slide flue pipe into sleeve, checking it is free to slide.
6. Slide Flexible wall seal over flue pipe and push centre ring up to sleeve flange when cold.
7. Locate wall plate over flexible wall seal and clamp in place using the raw plug pack.
8. Affix flue terminal
9. During boiler test check that the flue end is free to expand and contract with flexible wall seal.
Summary of Contents for System s30
Page 4: ...4 Installation and Servicing ...
Page 6: ...6 Installation and Servicing ...
Page 58: ......