1.4
SAFETY INFORMATION
IF YOU SUSPECT A GAS LEAK TURN OFF THE APPLIANCE IMMEDIATELY, TURN OFF
THE GAS TAP TO THE APPLIANCE (LOCATED UNDERNEATH) AND CONTACT YOUR
GAS SUPPLIER WITHOUT DELAY.
Benchmark Initiative
As part of the industry wide “Benchmark” initiative Qudos 28 boiler manual includes
Gas
Boiler Commissioning Checklist
(Chapter 10)
. This form should be completed by your
installer at the end of the installation and commissioning process. The details of the Checklist
will be required in the event of any warranty work being required. There is also
Service
Interval Record
(Chapter 10)
to be completed after each annual service visit.
These forms (Chapter 10) should be kept in a safe place for the life of the boiler.
The boiler should be installed and serviced only by CORGI registered operatives. All CORGI
registered Installers carry a CORGI ID card and have a registration number.
Both should be
recorded in your boiler manual (Chapter 10: GAS BOILER COMMISSIONING
CHECKLIST).
You can check your installer by calling CORGI direct on 01256 372300.
WD440/3/2007 Chapter 1 : User Instructions The Keston Qudos 28h & Qudos 28hP Boilers
Installation & Servicing Instructions
Page : 3