3. BOILER LOCATION
3.1
DIMENSIONS AND MINIMUM
CLEARANCES
The boiler must be installed in minimum
clearances shown to allow subsequent
servicing, and safe operation. However, larger
clearances may be required during installation.
3.2
SERVICE CONNECTIONS
Gas, water, air and flue pipe, condensation,
and electrical connections are as shown in the
diagram below. Gas : 15mm compression.
Flow/Return 0.75 inch BSP male, Gas 0.5 inch
BSP male, PRV 15mm copper pipe and
Condensate 21.3mm plastic pipe .
An optional stand-off frame is also available
which mounts behind the boiler to leave a
50mm deep space behind the boiler. This is
to permit pipe routing behind the boiler if
required. See Section 2.5 - Optional
Accessories.
3.3
POSITION
The Qudos 28h and Qudos 28hP Combi are
not suitable for external installation. The
boiler may be installed in any room or internal
space, although particular attention is drawn
to the requirements of the current IEE Wiring
Regulations and, in Scotland, the electrical
provisions of the Building Regulations
applicable in Scotland, with respect to the
installation of the boiler in a room or internal
space containing a bath or shower.
Where a room-sealed appliance is installed
in a room containing a bath or shower, any
electrical switch or appliance control, utilising
mains electricity, should be so situated that it
cannot be touched by a person using the
bath or shower. The Qudos 28h and Qudos
28hP are classified as IP20 (IPX0) and are therefore suitable for installation in Zone 3
areas, unless subject to hose down.
WD440/3/2007
Chapter 3 - Boiler Location
The Keston Qudos 28h & Qudos 28hP Boilers
Installation & Servicing Instructions
Page : 11
All dimensions in mm.
150
300 When servicing appliance
200
Figure 3.1.1
Minimum Clearances
5
5
10 When appliance is operating
All dimensions in mm.
390
28
0
Figure 3.1.2
Dimensions
Flue Exhaust
Air Intake
68
0
mm