any dust accumulated in and around the appliance before and after working on the appli-
ance. When replacing these articles we recommend that the replaced items are not broken
up, but are sealed within heavy duty polythene bags, and clearly labelled as RCF waste.
RCF waste is classed as a stable, non-reactive hazardous waste and may be disposed at a
landfill licensed to accept such waste. Protective clothing is not required when handling
these articles, but we recommend you follow the normal hygiene rules of not smoking,
eating or drinking in the work area and always wash your hands before eating or drinking.
Benchmark Initiative
As part of the industry wide “Benchmark” initiative Qudos 28h boiler manual includes
Gas Boiler
Commissioning Checklist
(Chapter 10)
. This form should be completed by your installer at the
end of the installation and commissioning process. The details of the Checklist will be required in
the event of any warranty work being required. There is also
Service Interval Record
(Chapter
10)
to be completed after each annual service visit.
These forms (Chapter 10) should be kept in a safe place for the life of the boiler.
The boiler should be installed and serviced only by CORGI registered operatives. All CORGI regis-
tered Installers carry a CORGI ID card and have a registration number.
Both should be recorded
in your boiler manual (Chapter 10: GAS BOILER COMMISSIONING CHECKLIST).
You can
check your installer by calling CORGI direct on 01256 372300.
WD440/3/2007 Chapter 2 : General Instruction
The Keston Qudos 28h & Qudos 28hP Boilers
Installation & Servicing Instructions
Page : 10
IN THE EVENT OF A GAS LEAK
Turn off the gas isolation valve to the property immediately. Extinguish
all naked flames or other sources of ignition. Do not operate electrical
switches on or off. Open all doors and windows to ventilate the area.