PLANETARY
GEAR
REDUCERS
#6
17
ozs.
#8
42
ozs.
#9
42
ozs.
B.
If
pump
has
lubricating
facilities
for
stuffing
boxes,
check
level
of
lubricant.
C.
Maintain
packing
gland
tension
on
packing
(Do
not
over
‐
tighten)
D.
Visually
inspect
pump
for
apparent
trouble.
E.
Keep
the
pump
clean.
GENERAL
Replace
any
work
part
before
its
eventual
failure.
Use
the
following
instructions
for
removal
and
replacement
of
parts.
Don’t
hesitate
to
call
on
Kerr
Pumps
for
help
if
necessary.
SERVICE
PROCEDURES
(ALL
MODELS)
A.
WING
GUIDED
VALVES
i.
DISCHARGE
VALVES:
The
discharge
valve
and
seat
can
be
exposed
by
first
removing
the
discharge
valve
cover
cap.
Once
the
discharge
cover
cap
has
been
removed
you
may
lift
out
the
discharge
valve
spring
and
the
discharge
valve.
The
valve
seat
will
be
held
in
place
by
a
taper
fit
and
must
be
“pulled”
with
an
appropriate
valve
‐
pulling
tool
(available
from
the
Kerr
Pumps
Dealers).
Once
the
valve
and
seat
have
been
removed
they
should
be
resurfaced
or
replaced
if
badly
worn.
To
replace
the
discharge
valve,
first
clean
and
inspect
the
seat
bore
for
washout
defects
and
then
drop
the
seat
into
the
bore.
Replace
the
valve
into
the
seat
and
strike
the
top
of
Summary of Contents for KT-3350XP
Page 19: ......
Page 22: ......
Page 24: ...KA 26G KA 28S GLAND GASKET KA 26 PONY ROD KA 28 SEALS KA 26 A PONY ROD PACKING GLAND ASSEMBLY...
Page 26: ......