The
Kerr
Pumps
Engineering
Service
will
be
happy
to
advise
you
in
your
installation
problems.
As
almost
every
installation
varies,
you
cannot
exercise
too
much
care
in
making
certain
your
installation
is
proper.
Before
Starting
The
Pump,
read
carefully
the
maintenance
section
in
the
following
pages.
To
start
the
pump,
open
the
suction
line
valve
and
permit
the
intake
chamber
to
fill
on
the
pump.
Air
may
be
bled
off
by
opening
the
valve
covers
slightly
until
there
is
a
constant
fluid
flow.
After
bleeding,
open
the
discharge
line
valve
and
start
the
pump.
Roughness
may
occur
from
cavitation
(air
in
line)
or
from
starvation
(lack
of
fluid).
Eliminate
these
troubles
before
permitting
continuous
operation.
For
best
results,
follow
these
installation
guidelines.
(A)
PRESSURE
RELIEF
VALVE
(REQUIRED)
(B)
BY
‐
PASSED
FLUID
SHOULD
BE
PIPED
BACK
IN
SUCTION
SUPPLY
TANK
WHEN
POSSIBLE
(C)
USE
FLEXIBLE
HOSE
IN
DISCHARGE
LINE
WHEN
POSSIBLE
(D)
DISCHARGE
SHUT
‐
OFF
VALVE
(OPTIONAL
‐
USED
FOR
TOTAL
SHUT
‐
DOWN
OR
SERVICE
ONLY)
(E)
DISCHARGE
AND
SUCTION
ON
EITHER
SIDE
OF
FLUID
END
ON
ALL
MODELS.
(F)
PULSATION
“DAMPENERS”
MAY
BE
USED
IN
EITHER
THE
SUCTION
OR
DISCHARGE
PIPING
OR
BOTH.
DISCHARGE
DAMPENERS
SHOULD
BE
CAPABLE
OF
HANDLING
PUMP
DISCHARGE
MAXIMUM
PRESSURE
Summary of Contents for KT-3350XP
Page 19: ......
Page 22: ......
Page 24: ...KA 26G KA 28S GLAND GASKET KA 26 PONY ROD KA 28 SEALS KA 26 A PONY ROD PACKING GLAND ASSEMBLY...
Page 26: ......