![KERN KERN AEJ Service Manual Download Page 15](http://html1.mh-extra.com/html/kern/kern-aej/kern-aej_service-manual_1957294015.webp)
5.3 Verification switch and seals
Prior to verification you will have move the calibration switch to verification position
(See direction of arrow, fig. 1). In this position the display shows a bracket around the
last display point.
After verification the balance is sealed at the indicated positions.
Seal of approval
Seal of approval
Fig. 1
Move verification switch to
verification position.
Seal/rubber plug/verification switch
Access to the verification switch is achieved
by removing the possibly existing seal (veri-
fication becomes invalid) and the rubber
plug.
Position of
verification switch
Status
forwards
Balance is unlocked for the adjustment process, ad-
justment will be possible "ADJ" appears when the bal-
ance is switched on.
backwards
Verification position - Adjustment locked
15
Summary of Contents for KERN AEJ
Page 5: ...3 Electric Electronic Construction 3 1 Block Diagram Calibration Weight Unit AEJ only PRINT 5 ...
Page 6: ...3 2 Whole Wiring Calibration Weight Unit AEJ only PRINT 6 ...
Page 7: ...4 Troubleshooting 4 1 Troubleshooting Procedure 7 ...
Page 11: ...4 4 Check of Electric Electronic Parts 1 Check of HT DP board 11 ...