8
EOA-BA-e-1611
6 Unpacking, Setup and Commissioning
6.1 Installation Site, Location of Use
The balances are designed in a way that reliable weighing results are achieved in
common conditions of use.
You will work accurately and fast, if you select the right location for your balance.
Therefore, observe the following for the installation site:
•
Place the balance on a firm, level surface;
•
Avoid
extreme heat as well as temperature fluctuation
caused by installing
next to a radiator or in the direct sunlight;
•
Protect the balance against direct draughts due to open windows and doors;
•
Avoid jarring during weighing;
•
Protect the balance against high humidity, vapours and dust;
•
Do not expose the device to extreme dampness for longer periods of time. Non-
permitted condensation (condensation of air humidity on the appliance) may
occur if a cold appliance is taken to a considerably warmer environment. In this
case, acclimatize the disconnected appliance for ca. 2 hours at room
temperature.
•
Avoid static charging of the material to be weighed, weighing container and
windshield.
Major display deviations (incorrect weighing results) may be experienced should
electromagnetic fields (e.g. due to mobile phones or radio equipment), static
electricity accumulations or instable power supply occur. Change location or remove
source of interference.
6.2 Unpacking
Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.
6.2.1 Placing
The balance must be installed in a way that the weighing plate is exactly in horizontal
position.