
DBS-BA-e-1311
35
The second temperature point to be tested will
be displayed.
Confirm with the
ENTER
button, the second
heat-up phase is started.
Temperature calibration for the second point
takes 15 min. Compare the displayed
temperature value on the thermometer with that
of the moisture analyser whilst the temperature
display is flashing. If the two values do not
match, correct them using the navigation
buttons
and confirm with the
ENTER
button Numerical input, see chap. 7.1.1.
The adjustment is completed when “END” is
displayed. The device returns to the menu
automatically.
The adjustment protocol output is started upon
connection to an optional printer and activated
GLP function (see chap. 6.3).
Press
ESC
to return to Moisture analysis mode.
•
The adjustment protocol output is started upon connection to an
optional printer and activated GLP function (see chap. 6.3).