Because some minor collateral damage may
occur during the installation of a prefinished floor,
minor touch-ups with the use of the appropriate
colored putty, marker-stick or filler is considered
acceptable industry practice, provided the these
repairs pass inspection from a standing position.
12
INS
TALL
A
T
ION INS
T
R
UC
T
IONS
R
ev
ela
tion | 06.2018
Part 4B.
GLUE DOWN INSTALL ATION
NATURAL OILED PRODUCTS
When installation is complete, install moldings and transitions as required.
Wait 24 hours or until the adhesive has fully cured before moving furniture or appliances onto floor or
before allowing heavy foot traffic. Wait 24 hours before applying a floor protection membrane.
If the flooring was installed over a radiant heating system, wait 24 hours after installation or until the
adhesive has fully cured before turning the system back on. Bring the temperature of the system up
gradually, in 5
O
F (2
O
C) increments per day. Never allow the surface temperature of the floor to exceed
80
O
F (26
O
C) and avoid dramatic temperature changes; always adjust the system gradually in 5
O
F (2
O
C)
increments per day. It is recommended that a dedicated quick recovery thermostat be installed to allow
the temperature of the radiant heating system to be accurately controlled.
Summary of Contents for Revelation
Page 1: ......