background image

OPERATION

Lighting Procedure:

1.  Push in the control knob and turn anti-clockwise to the pilot position.

The ignition unit should spark as this is done.

Check if the pilot light has ignited.  If not, repeat step one.

Once the pilot has lit, continue to hold in the control knob for 

approximately 20 seconds.

If the pilot fails to light after 2 or 3 

attempts, turn the control knob to OFF and wait 5 minutes for unburnt

gas to escape before trying again.

2.  To turn on the main burner, turn the control knob to the HIGH position.

 

Always run the fireplace on HIGH for the first 10 minutes to warm

up the fire and chimney and allow the chimney to draw properly.

3.  To turn down the fireplace, turn the knob fully anti-clockwise.

To turn the fireplace off:

Turn the control knob to the PILOT position, then push in and turn clockwise

to OFF.

Fan Operation:

The fan has one speed, and is operated by a manual switch adjacent

to the control knob.  The switch has an OFF position in the centre, and ON

above OFF.  For most situations, the fan will ensure ample circulation of heated

air throughout the room.

7

.

Summary of Contents for SIENNA KGF260-002

Page 1: ...CORATIVE OPEN GAS FIRE Models KGF260 002 KGF260 005 KGF260 003 KGF260 006 KGF260 004 KGF260 007 Installation Servicing and Operation Manual INSTALLER These instructions must be left with the owner 1 2...

Page 2: ...rtains clothes drapes furniture and other such material at least 900mm away from the appliance Never attempt to burn paper or any other material in the flames THE APPLIANCE SHALL BE INSPECTED BEFORE U...

Page 3: ...of the fireplace and any building structure or other substantial immovable object in front of the fireplace 3 Model Gas Type Burner Pressure Gas Consumption KGF260 002 NG 1 00 kPa 30 5 MJ h KGF260 00...

Page 4: ...55mm Installation into a wall cavity or false chimney The insert may be installed into a wall cavity or false chimney This shall be constructed generally as shown in the accompanying drawing of 75 x 5...

Page 5: ...The chimney must be swept clean and any debris removed completely The size of the opening must be checked to ensure that the space is big enough to accommodate the insert Some bricks may need to be r...

Page 6: ...y set the fascia panel may be attached to the casing using the magnets included Assembly of the burner The insert is factory assembled but it is necessary to place the coals onto the burner pan before...

Page 7: ...again 2 To turn on the main burner turn the control knob to the HIGH position Always run the fireplace on HIGH for the first 10 minutes to warm up the fire and chimney and allow the chimney to draw pr...

Page 8: ...eaks and the valve for correct smooth operation Check the ignition spark is strong and consistent Check the pilot for accumulation of dust or dirt Clean as required Do not attempt to ream or drill out...

Page 9: ...id test point o ring FE190 025 Dec Fire test point screw M5 x 8 pan 12 FE190 026 Dec Fire orifice elbow Injectors 13 FE190 027 Dec Fire injector LPG B 7 hole 0 65mm FE190 028 Dec Fire injector LPG B...

Page 10: ...th the owner s manual furnished with the product Any alterations or modifications including those affecting the product s performance operation safety durability or changes in its intended use Additio...

Page 11: ...and address of the selling Dealer Please Note When travel to remote locations is required exceeding 35 km or 45 minutes the additional distance traveled will be chargeable to the customer by the Serv...

Page 12: ......

Reviews: