
X8 SuperSnake GT02XW
Operating manual - EN
CONTENTS
1. X8 SuperSnake GT02XW
3
1.1 Equipment description
4
2. Installation
6
2.1 Wire feed mechanism components
7
2.2 Subfeeder installation
8
2.3 Feed roll pressure adjustment
11
2.4 Mounting wire spool
13
2.5 Preparing filler wire
14
2.6 Connecting subfeeder
15
2.7 Loading filler wire into subfeeder
18
2.8 Shielding gas setting
19
2.9 Cooler preparation
20
2.10 Voltage sensing cable calibration
21
3. Maintenance
22
3.1 Wire liner replacement
24
3.2 Disposal
30
4. Technical data
31
5. Ordering
32
5.1 Feed roll kit selection
33
5.2 Wire liner selection
35
© Kemppi
2/35
Rev. 1901