background image

KEMLAN XL FREESTANDING Mk. III

INSTALLATION & OPERATING INSTRUCTIONS

IMPORTANT:

INSTALLER  PLEASE  LEAVE THESE  INSTRUCTIONS  WITH  THE  UNIT  ON COMPLETION.

1x900mm LENGTH  HEATSHIELD  OR DECROSHIELD  MUST  BE FITTED  TO THE  FLUE  TO ACHIEVE 

CLEARANCES  TO HEAT  SENSITIVE  MATERIALS.

10 YEAR  FIREBOX  WARRANTY

The firebox is covered by a 10 year warranty. 

Other parts are covered by a one year limited warranty.

Head Office – 13 French Avenue, Brendale, Queensland 4500

Telephone – PH: (07) 3490 5500

Facsimile – FAX: (07) 3490 5520

Website: -

www.kemlan.com.au

Business hours: - Monday to Thursday 7:30am-4:00pm. Friday 7:30am-2:00pm

Email: -

[email protected]

Summary of Contents for XL MK111

Page 1: ...HE FLUE TO ACHIEVE CLEARANCES TO HEAT SENSITIVE MATERIALS 10 YEAR FIREBOX WARRANTY The fireboxis coveredby a 10 year warranty Other parts are coveredby a one year limited warranty Head Office 13 French Avenue Brendale Queensland 4500 Telephone PH 07 3490 5500 Facsimile FAX 07 3490 5520 Website www kemlan com au Business hours Monday to Thursday 7 30am 4 00pm Friday 7 30am 2 00pm Email sales kemlan...

Page 2: ...D B A C A 785mm w idth B 838mm height C 603mm depth D 216mm depth centre of flue to back OVERALL DIMENSIONS OVERALL DIMENSIONS ...

Page 3: ...right to alter specifications without notice CONSTRUCTION 6 8mm heavy duty steel firebox fully w elded 25mm thick firebricklined floor 19mm ceramic lined sides and baffle PERFORMANCE Heating capacity 220 320m2 23 33 squares Peak heat output 21 6kW Average output 2 0g kg Average efficiency 61 Heating capacity of this appliance is given as a guide only and may vary depending on the climate zone and ...

Page 4: ... celling plate Vented cap Decroshield 150mm min NOTE When decromesh heatsheild is fitted it must finish a minimum 600mm below the ceiling or extend through the ceiling drop box into the outer flue casing Alw ays cover flue completely until installation and cleanup is complete Support outer flue w ith bracket supplied Run a bead of silicon dow n seam of outer casing to ensure against leaks Pop rive...

Page 5: ...eatsheild is fitted it must finish a minimum 600mm below the ceiling or extend through the ceiling drop box into the outer flue casing Alw ays cover flue completely until installation and cleanup is complete Support outer flue w ith bracket supplied Run a bead of silicon dow n seam of outer casing to ensure against leaks Pop rivet or screw bracketsto the outside of the outer casing Short tube fits...

Page 6: ...LLATION TO COMPLY WITH AS NZS 2918 INCREASE FROM 1000 MIN UNTIL CLEAR WITHIN 3000 OF TOP OF FLUE 3000 ANY NEARBY STRUCTURE 3000 MORE THAN 3000 600 MIN 3000 1000 MIN IF CLEAR WITHIN 3000 OF TOP OF FLUE INCREASE ASNECESSARY UNTIL NOTHING WITHIN 3000 OF FLUE TOP 600 MIN 3000 OR LESS ...

Page 7: ... DURING CURING Don t touch the surface It will be soft and gummy during this paint curing phase Once cured it will not be soft again CURE WITH 3 FIRES Most stoves cure with 3 burns The first two 2 should be 250 F for 20 minutes or about half a normal fire Let the stove cool down between burns The last fire should be 500 F to 700 F for at least 45 minutes The point being cure slowly without a hot f...

Page 8: ...pproximately 10 to 15 minutes until the new pieces are burning w ell then it may be returned to its desired setting 6 To set the fire for overnight burn tw o thirdsfillthe firebox w ith hardwood and fully open the air inlet Once the fire is burning w ell the air inlet controlshould be shut dow n approximately three quarters of its travel Setting the air inlet controlmay be varied to suit your part...

Page 9: ...s better w ith higher heat production than w et or green w ood The differencebetween the amount of heat produced by dry w ood and green w ood is so great that a dry softwood of good grade w illproduce more heat than green hardw ood Green w hite ash for instance is not as good a fuelas dry tamarack The reason for the superiority of dry w ood is easy to understand Heat cannot be produced until moist...

Page 10: ......

Page 11: ...ective heater or re installation ofreplacement heater 4 8 Failure to use fireplace components supplied byKemlan Industries Pty Ltd 4 9 Costof inspection for damaged heater 5 CLAIMS 5 1 I Kemlan will provide a full replacement ofthe heater in the firstfive years after installation ii Replacement in the subsequent five years i e sixth to tenth year after installation will be on the following basis O...

Reviews: