Kelly
Engineering
Phone:
+ 61 8 8667 2253
PO
Box
100
Email:
Booleroo Centre SA 5482
Website (Australia):
www.kellyengineering.com.au
Australia
Revision C
Register within 2 months of purchasing the machine to
receive an additional 12 months warranty.
Find the registration information on page 12
Tillage System 6m
Operating Instruction Manual
Serial number:
Summary of Contents for CL1
Page 10: ...10 Section 1 Warranty ...
Page 14: ...14 Section 2 Machine Operation ...
Page 16: ...16 Park brake Fig 7 Rotate counter clockwise to apply brake ...
Page 19: ...19 The chain is set correctly at 69 Bar 1000 psi Fig 12 ...
Page 22: ...22 Folding Fig 16 ...
Page 23: ...23 Fig 17 Folding ...
Page 24: ...24 Fig 18 Folding ...
Page 25: ...25 Section 3 Chain Operation Correct Setup ...
Page 27: ...27 Wing set up prior to operating Make sure the pin is centred Fig 22 ...
Page 29: ...29 Fig 24 ...
Page 31: ...31 Fig 26 ...
Page 33: ...33 Dropleg height adjustment Fig 29 ...
Page 36: ...36 Section 4 Maintenance Inspection ...
Page 40: ...40 Section 5 Specification ...
Page 42: ...42 Section 6 Pre Delivery Checklist ...
Page 44: ...44 Notes ...
Page 45: ...45 Notes ...
Page 46: ...MANOPE 6M Issue C 20 01 2020 ...