Starter Kit Instruction Manual
Page
5
of
9
www.KegLand.com.au
Last Updated 1/30/2018 8:44 PM
FermZilla – Lid Assembly
1.
Ensure the lid assembly has the o-ring
attached.
2.
Apply some food grade lubricant to the o-
ring to extend the life of this o-ring and
threads.
3.
Place the lid onto the neck of the tank and
screw down the threaded lid ring.
4.
Use one of the bottle caps to close of one of
the holes in the lid.
5.
Ensure the Red PRV is placed into the
pressure relief valve.
6.
Push the three piece air-lock into the
silicone bung then push both parts into the
remaining hole in the lid.