background image

- 7 -

INSTALLATION INSTRUCTIONS

Before starting on the installation of the stove, the following steps need to be fully completed:

The chimney:

Alternative 1  An existing chimney prepared for rear connection

Alternative 2  A newly installed chimney prepared for rear connection

Alternative 3  Preparation for a new top connection chimney

Outdoor air supply

 (if so required)

Hearth floor plate

 (unless a floor plate or floor glass is to be installed afterwards)

1. Move the stove indoors and put it into 

position. Adjust the stove horizontally and 

vertically using the feet under the base by the 

floor. 

A suitable place to check horizontally and 

vertically with the help of a spirit level is on 

the hearth's sealing plate.

Tip!

 The stove is vertical and horizontal 

when the door stays open at an opening an

-

gle greater than 90-95 degrees and when it 

closes automatically at an opening angle less 

than 85-90 degrees. 

Where applicable, connect outdoor air to the 

hearth.

2. To dismantle the front/door, start by 

unscrewing the two front bolts that secure 

the inner roof to the cassette front. After this, 

loosen the centre screw at the centre of the 

inner roof's front edge.

Then open the door fully. Unscrew the four 

bolts in each corner. 

After this, carefully pull the front towards you 

until it comes free from the two guide rails. 

Carefully put the front to one side, to avoid 

damage to the opening handle. The front and 

door weigh approx. 35 kg.

Summary of Contents for K700

Page 1: ...K700 Installation Instructions Care and firing instructions...

Page 2: ...plate Outdoor air supply Flue Chimney connections PREPARATIONS 5 7 Flue connections for rear and top installation Floor plate and outdoor air connection Unpacking Dismantling INSTALLATION INSTRUCTION...

Page 3: ...sional perform the installa tion Our dealers can recommend suitable fitters You can find information about our dealers on www keddy se The Clean Air Act 1993 and Smoke Control Areas Under the Clean Ai...

Page 4: ...an use Keddy s own floor plate or floor glass These are installed after completing the installa tion of the stove OUTDOOR AIR SUPPLY For the combustion of wood air supply air is required The K700 can...

Page 5: ...stallation Alternative 2 Top installation Height from the floor to the centre of the flue at the rear 665 mm Height from the floor to the height of the connection top 820 mm Outer diam of the rear top...

Page 6: ...he connecting pipe passes through a flammable wall The flammable wall therefore must be furnished with a shaft with fire retardant lining Masterboard Minerit or equivalent and be insulated with at lea...

Page 7: ...heck horizontally and vertically with the help of a spirit level is on the hearth s sealing plate Tip The stove is vertical and horizontal when the door stays open at an opening an gle greater than 90...

Page 8: ...s leave at least 10 mm of venti lated space between the top of the stove and the chimney s insulation outer steel jacket see illustration The first section of the chimney is normally half insulated ap...

Page 9: ...harmful for both people and the environment BEFORE FIRING WHEN THE STOVE IS NEW During the first week firing can be started carefully Start with one to two fires during the first couple of days A par...

Page 10: ...t that you turn off the ventilation temporarily or open a window until the negative pressure has dissipated If there is insufficient burning material in the firebed to light a new fuel charge excessiv...

Page 11: ...NSIONS AND PERFORMANCE Height 820 mm Width 564 mm Depth 425 mm Weight 170 kg Height centre rear connection 665 mm Height top connection 820 mm Outer dimensions connection sleeve 125 mm Useful efficien...

Page 12: ...12 www keddy se Rev 1 01 05 2015...

Reviews: