Keba KeContact KC-S10 Installation Manual Download Page 18

KC-S10

Connections and wiring

V

18

© KEBA 2022

WARNING!

Risk of electric shock and fire hazard!

The X2.1 and X2.2 supply lines must be wired with a cable with the corre-
sponding insulation for 230 V. Other lines in the housing may touch these
lines.

Fig. 7-8: Circuit diagram

Summary of Contents for KeContact KC-S10

Page 1: ...KeContact KC S10 Phase switching device Installation manual V 1 00 Translation of the original instructions...

Page 2: ...further technical developments Details presented may be subject to correction All rights reserved KEBA Energy Automation GmbH Reindlstra e 51 4040 Linz Austria www keba com emobility 43 732 7090 0 43...

Page 3: ...4 System overview 10 5 Description 11 5 1 Front view 11 5 2 Rear view 11 5 3 Side view 12 5 4 Top view 12 5 5 Type plate 12 6 Mounting and installation instructions 14 6 1 General criteria for the si...

Page 4: ...2 Power supply 24 12 3 Interfaces 24 12 4 Ambient conditions 24 12 5 Mechanical properties 25 12 6 Dimensions and weight 25 13 Directives standards and regulations 26 13 1 EU Directives and Standards...

Page 5: ...in death or se rious bodily injury if the corresponding precautions are not taken WARNING indicates a potentially hazardous situation which can result in death or seri ous bodily injury if the corres...

Page 6: ...perated in combination with a KEBA charging station Information The device may only be operated with a charging station with software ver sion 1 15 Otherwise proper operation is not ensured The device...

Page 7: ...from the safety instructions given in this man ual the safety precautions and accident prevention measures appropriate to the situation in question must also be observed 1 5 1 Contents of the documen...

Page 8: ...ommission and repaired or re placed by a qualified and authorized electrician Repair of the device is not permitted and may only be carried out by the manufacturer No unauthorized conversion work or m...

Page 9: ...KC S10 Scope of delivery V 9 KEBA 2022 3 Scope of delivery The following materials are included 1 x M20 cable gland 2 x M32 cable gland 4 x cover for inner mounting screws...

Page 10: ...er there is sufficient current for each phase of a 3 phase charging process cyclically using the energy meter If there is less than 6 A per phase then the KC S10 switches off 2 phases The charging pro...

Page 11: ...ription V 11 KEBA 2022 5 Description 5 1 Front view Fig 5 2 Front view 1 Housing screws 2 Housing cover 3 Hinged cover 5 2 Rear view Fig 5 3 Rear view 1 Knockout for M20 cable insertion opening 2 Moun...

Page 12: ...cover 5 4 Top view Fig 5 5 Top view 1 Knockout for M20 cable insertion opening 2 Knockout for M32 cable insertion opening for power supply 3 Housing box 4 Housing cover Information The positions of t...

Page 13: ...example The actual data on the type plate de pends on the variant Fig 5 6 Example type plate 1 Manufacturer 2 Product designation 3 Technical data 4 Test report no 5 Manufacturer s address 6 Country o...

Page 14: ...ut doors the connection panel cover is not permitted to be opened in case of rain wind or snow Only vertical installation on a wall is permitted Do not subject the device to high humidity for a longer...

Page 15: ...cations where falling objects could damage the device e g hung up ladders or automobile tires The device must not be exposed to direct spray water e g neighboring manual car wash facility high pressur...

Page 16: ...orrectly before initial commissioning proceed as fol lows 1 Mark the four drill holes on the intended place on the wall 2 Drill boreholes and if necessary insert anchors in the holes 3 Pull the cable...

Page 17: ...reaker of the supply line serves as a main switch 7 2 1 Cable installation Note the following points during cable installation The supply line must be guided far enough into the cable gland that the c...

Page 18: ...KEBA 2022 WARNING Risk of electric shock and fire hazard The X2 1 and X2 2 supply lines must be wired with a cable with the corre sponding insulation for 230 V Other lines in the housing may touch th...

Page 19: ...Power supply from power connec tion 2 Power supply to charging station 3 Wiring to floating contact X2 of the charging station 4 Terminal X1 L1 5 Contactor 1K7 6 Terminal X1 N and grounding termi nal...

Page 20: ...t be set as follows DIP switch Setting DSW1 2 OFF DSW1 3 ON The following settings must be configured in the web interface of the charg ing station 1 Call up the web interface at https kecontact web U...

Page 21: ...ommissioning check the effectiveness of the safety measure s of the system according to the nationally applicable regulations Electrical systems or devices must be checked by the installer of the syst...

Page 22: ...nce No further maintenance work is necessary The device is maintenance free 10 1 Troubleshooting Further information e g operating and configuration instructions and con tact details are available on...

Page 23: ...l with the crossed out waste container means that electrical and electronic devices including their accessories must not be disposed of in the household garbage The materials are recyclable in accorda...

Page 24: ...supply Nominal supply voltage Europe 3 x 230 V 400 V Nominal current 10 A 13 A 16 A 20 A 25 A 32 A 1 phase or 3 phase Power line frequency 50 Hz Network configurations TT TN IT Internal consumption 6...

Page 25: ...l properties Construction Housing box Polycarbonate Housing cover Polycarbonate glass fiber reinforced Hinged cover Polycarbonate blue transparent Seal Polyurethane Housing screws Polyamide glass fibe...

Page 26: ...al rules EN 61439 3 2011 Low voltage switch component combinations Part 3 Distribution boards intended to be operated by ordinary persons 13 1 EU Directives and Standards 2014 35 EU Low voltage Direct...

Page 27: ...die f r bestimmte Produkte erforderlich ist die in Gro britannien England Wales und Schottland auf den Markt gebracht werden Authorised representative is KEBA Ltd Aston Court Frederick Place Kingsmead...

Page 28: ...KC S10 Declaration of conformity V 28 KEBA 2022 15 Declaration of conformity The declaration of conformity of this product is available on request from KEBA...

Page 29: ...KC S10 Appendix Drilling template V 29 KEBA 2022 16 Appendix Drilling template...

Page 30: ...KC S10 V 30 KEBA 2022...

Page 31: ......

Page 32: ...KEBA Energy Automation GmbH Reindlstra e 51 4040 Linz Austria www keba com...

Reviews: