
KC-S10
Mounting and installation instructions
V
16
© KEBA 2022
6.3
Required tools
The following tools are required for the installation:
●
Ø 6 mm drill (appropriate for subsurface)
●
Screwdriver/bit (appropriate for the screws used)
6.4
Mounting the device
The following aids are required for the initial installation:
●
16 Appendix: Drilling template
●
4 anchors (according to wall material)
●
Washers (optional)
●
4 screws
To install the device correctly before initial commissioning, proceed as fol-
lows:
1) Mark the four drill holes on the intended place on the wall.
2) Drill boreholes and, if necessary, insert anchors in the holes.
3) Pull the cable through the prepared openings on the device (top and bot-
tom).
4) Guide the supply line far enough into the cable gland that the cable
sheath is visible in the connection area.
5) Tighten the cable glands. Pay attention to leak tightness (M20: max. 4
Nm, M32: max. 7 Nm).
6) Offset any unevenness with washers.
7) Position the device on the wall and tighten to the wall with the four
screws (max. 1.2 Nm).
The device is now mounted on the wall and ready for wiring.