2
Connect the cable to the plankton pump. Take care
not to damage the cylindrical parts of the
connectors. Any deformation will hinder a proper
connection and the O-ring cannot tighten properly.
3
Push the connectors firmly to each other and the
eye of the bracket must fit into the small tap of the
connector to ensure ground is present through the
connector. Tighten the screw firmly. Do not use
the screw to pull
the connector’s parts to each
other.
When you disassemble the connector, take care so
you don’t lose the eye
and the screw.
5
Connect the cable with the CEE plug on the right
side of the control box. The cable is for the main
supply of 230 VAC/1 ph.
Connect the cable to the Subconn connector on
right side of the control box.
6
Use a steel wire or similar for deploying the pump.
Do not use the cable itself for the deployment, as
it cannot hold the pump’s weight.
Grease the Subconn connector before attaching;
see the guide on page 7-11.
7
Connect the main cable to main supply of 230
VAC, 1 ph. Power consumption: 750 W. Ensure a
good ground connection for the equipment to avoid
electrical shock and injury to personnel.