background image

THYRO

SWITCH

User Manual

Page - 6 -

Version 1.0

E

D

EBD

A0
08
0 /
 17

07-

1

 GB

For the connection of the load current with 

insulated

 crimping cable lugs with 8mm rings, terminal studs are

envisaged that must be tightened with a torque of 5.5 - 6Nm. The cable lugs must be exactly vertical to the
conducting plate. When laying leads, you should ensure that the connection leads are not heated up directly by
the exhaust from the heat sinks. As load fuses, fuse units for the protection of semiconductors must be used.
Project planning of their size must be made according to the connected capacitive load. You must ensure that the
equipment grounding conductor is connected correctly. The equipment grounding conductor connection in the
form of an M6 hexagon bolt is located on the heat sink beneath the connections for the capacitor and is labeled
with the PE conductor sign 

.

For reactor-protected equipment it is absolutely essential that the 

THYRO

SWITCH

 

is connected in series

before  inductor and capacitor.

Terminal 1(+) and 3(-):

For gating with 10-30V DC, terminal 1 must be connected to plus and 
terminal 3 to minus. 

(see design: DC gating on page 5)

Terminal 2 and 3:

For gating with 180-260V AC  50/60Hz, terminals 2 and 3 must be used.

(see design: AC gating on page 5)

 

Terminal 4 and 5:

The supply voltage 200-250V AC or 100-130V AC with 50 or 60Hz is connected 
to terminals 4 and 5. 

(see design: DC gating and AC gating on page 5)

6

Commissioning

1.  Check the correct connections of the 

THYRO

SWITCH

2. Attach plastic housing

3. Switch on supply voltage ("Power" LED lights up)

4.  Possible test of gating by the controller ("Control" LED lights up and fan starts up)

Note:

 

The operational current may only be released for the initial commissioning if  

no gating takes place, that is, the 

THYRO

SWITCH

 is switched off.

6. Connecting operational current

7.  Release controller (for gating and correct function, "Power", "Control", "Thyr1" and "Thyr2" light up)

Summary of Contents for THYRO SWITCH

Page 1: ...HYRO SWITCH Operating Instructions Technical Parameters KBR GmbH Am Kiefernschlag 7 D 91126 Schwabach Phone 49 0 9122 6373 0 Fax 49 0 9122 6373 83 email info KBR de s s s s s ENERGIEMANAGEMENT mit System ...

Page 2: ...ual Page I Version 1 0 EDEBDA0080 1707 1 GB Contents 1 Intentended Use 1 2 Safety Notes 2 3 Areas of Application 3 4 Installation 4 5 Connection 5 6 Commissioning 6 7 Type Overview 7 8 Declaration of Conformity 7 9 Notes 8 ...

Page 3: ...y voltage UN Load current Power dissipation 400 500V 50Hz 60Hz max 115A 500V 70A approximately 2W per A Application area Creepage distance from control input to main circuit Rated voltage Harmonic voltage 10 5mm for SELV voltage circuits UN 10 DIN EN 61000 2 4 class 3 THD max 10 Switch on delay Switch off time 5s Control input DC 0 max 20ms AC 10 max 30ms Re make tome Cyclic operation Control inpu...

Page 4: ...er supply system the capacitive load is charged to network peak voltage In addition a phase is connected directly to the load This means that the load is under voltage even when switched off and remains connected to the power supply When working on the load disconnection from the network must be made under all circumstances Danger to life Even after disconnection from the network a residual charge...

Page 5: ...CH compared to conventional technology are High switching speed Switching behavior with low system pollution Switching with no wearing parts Long working life through practically unlimited frequency of operations Areas of application Crane equipment Lifts Welding equipment Molding Wind turbines The power switch can be operated in conjunction with VAr controllers memory programmable controls comput...

Page 6: ...ted in one direction At maximum load a temperature increase of max 40 C can be expected If temperature sensitive components are used such as cable ducts it is possible that cowls must be provided Distances Fan side 50mm Heat sink outlet 150mm With vertical installation it must be ensured that warm air is always emitted upwards When installing several THYRO SWITCH on top of one another cowls should...

Page 7: ... THYRO SWITCH Version 1 0 Page 5 EDEBDA0080 1707 1 GB 5 Connection DC gating U2 V2 W2 W1 V1 U1 L1 L2 L3 PE 1 2 3 10 30V DC 230V 115V 4 5 6 AC gating 180 260V AC U2 V2 W2 W1 V1 U1 L1 L2 L3 PE 1 2 3 230V 115V 4 5 6 ...

Page 8: ...or sign For reactor protected equipment it is absolutely essential that the THYRO SWITCH is connected in series before inductor and capacitor Terminal 1 and 3 For gating with 10 30V DC terminal 1 must be connected to plus and terminal 3 to minus see design DC gating on page 5 Terminal 2 and 3 For gating with 180 260V AC 50 60Hz terminals 2 and 3 must be used see design AC gating on page 5 Terminal...

Page 9: ...s product see table meets the regulations of Directives 73 23 EEC and 89 336 EEC and complies with the following standards or reference documents EN 61010 1 2002 EN61010 1 B1 2002 EN 61010 1 B2 2004 EN 61000 6 1 2002 EN 61000 6 2 2002 EN 61000 6 3 2002 EN 61000 6 4 2002 Type Voltage Frequency Current TSK40509 400V 50Hz 90A TSK40609 400V 60Hz 90A TSK40511 400V 50Hz 115A TSK40611 400V 60Hz 115A TSK5...

Page 10: ...THYRO SWITCH User Manual Page 8 Version 1 0 EDEBDA0080 1707 1 GB 9 Notes ...

Page 11: ...ungsvorschläge Bitte geben Sie die betreffende Anleitung oder Druckschrift mit Versionsnummer und oder Aus gabestand an If you come across misprints in this user manual or printed material please take the time to notify us We will also be glad to hear your ideas notes and suggestions for improvement Please identify the user manual or printed mate rial in question with version number and or revi si...

Reviews: